Travertine walk-in shower with a glass panel beside a floating walnut vanity, a round mirror and soft daylight on plaster walls

Service 01 of 07 · Scottsdale, AZ

Full Bathroom Remodeling in Scottsdale, AZ

You want the whole bathroom planned once, from layout to last fixture. Tell us what bothers you, and someone from our team will call you back.

What you get

Every part of the bathroom planned in one pass

A full bathroom remodel in Scottsdale replaces the parts of a bathroom that have worn out with materials and details chosen to last: tile, stone, glass, fixtures, lighting and ventilation that suit the room and how it is used.

  • Every trade planned in one order: design and selections, demolition, plumbing and electrical, waterproofing, tile, glass
  • Selections locked in the design phase, and nothing ordered until the field measurements are taken
  • Waterproofing behind the tile, a fan ducted to the outside and blocking for grab bars while the walls are open
  • A working schedule agreed before demolition starts and updated as the project moves
  • Permit needs confirmed before demolition, not after it

To talk through your project and set up an on-site assessment, call (602) 782-5702.

Get a call back

Close view of a travertine counter with a carved basin and a brushed brass wall faucet over walnut drawers

Timing

5 signs your Scottsdale bathroom is due for a full remodel

If two of these sound familiar, your bathroom is due.

Gutted bathroom with exposed wall studs and drain pipes, a window and plastic sheeting laid over the concrete floor
  • Original tile, tub and vanity

    Much of North Scottsdale was built in the 1990s and 2000s, so some bathrooms there still carry their original tile, tubs, vanities and lighting.

  • A room that feels tight

    In older parts of town, rooms can be smaller and layouts tighter.

  • Scale on glass, fixtures and tile

    Hard water leaves scale on all three, and it can be a reason to plan an update.

  • Humidity that lingers

    A fan ducted to the outside clears shower moisture and keeps humidity off paint and mirrors, and ventilation is checked and often upgraded during a remodel.

  • A leak you cannot see

    Supply and drain lines pass through the walls behind tile and cabinetry, and supply lines that have aged out are one of the predictable failures.

Recognize your bathroom? Get a call back

3 steps

How your Scottsdale bathroom remodel gets planned and priced

Long walnut vanity with a travertine top and integrated basin, a wall faucet and a rounded mirror against sage tile
  1. Tell us what you need

    Send the form or call, and describe what bothers you about your bathroom.

  2. We call you back

    We go over your project, the budget and the timing with you.

  3. Your bathroom gets planned

    After an on-site look, it is priced in writing and put on the calendar.

Before the call, list the 3 things that bother you most and your budget range.

Costs

What does a full bathroom remodel cost in Scottsdale?

Cost tracks size, materials and what is behind the walls, and published Scottsdale ranges span several levels:

  • Shower or vanity refresh from about $8,000 to full renovations above $30,000, with most projects at $12,000 to $25,000 (a remodeling firm serving Scottsdale)
  • Standard package from $19,000, with prices described as averages that vary with project size and materials (a Scottsdale remodeling firm)
  • Guest bathroom $20,000 to $30,000 and primary bathroom $35,000 to $75,000 (a Phoenix-area remodeling firm)

The spread reflects the size of the room, the materials selected, and whether plumbing or layout changes are part of the work. A national cost guide publishes a lower band, from $6,000 to $18,000 with a $12,000 average, and $9,000 to $30,000 for a total overhaul, which shows how much scope drives the number. These are published market ranges, not quotes. The actual price is set after an on-site assessment. More ranges for individual scopes and components are on the bathroom remodel cost page.

Flat lay of tile and cabinet door samples with three faucets in chrome and brass on a plaster-colored surface

How it works

What does a full bathroom remodel in Scottsdale involve?

A full bathroom remodel replaces the working parts of a bathroom inside its existing walls: surfaces, fixtures, waterproofing, lighting and ventilation. The tub or shower area is rebuilt, the vanity and toilet are replaced, tile and stone go down, and the room is finished with light that works and a fan that clears moisture. Scottsdale adds local context. Much of North Scottsdale was built in the 1990s and 2000s, so some bathrooms there still carry their original tile, tubs, vanities and lighting. In older parts of town, rooms can be smaller and layouts tighter. Hard water is another local factor, leaving scale on glass, fixtures and tile, and it can be a reason to plan an update. The aim is a room that looks considered, cleans easily and holds up in a desert climate.

Good to know

What work is included in a standard bathroom remodel?

A standard full remodel covers every trade in the room, in a set order: design and selections first, then demolition, then plumbing and electrical work, then finishes. A typical scope includes:

  • Design and selections for tile, stone, glass, fixtures, lighting and paint
  • Demolition and disposal of the old room
  • Framing and blocking, including blocking for grab bars and vanity cabinets
  • Plumbing rough-in
  • Electrical work, including GFCI-protected outlets
  • Waterproofing behind the tile and a new shower pan where a shower is built
  • Tile, shower glass, and the tub or shower, toilet, vanity and sink, faucets and trim
  • Mirror, lighting and ventilation fan
  • Paint, trim and a full cleanup
  • Inspections where permits require them

Work outside that scope, such as moving a drain or opening a wall, is priced and permitted as its own part of the project.

Stone freestanding tub with a wall-mounted filler, a walnut console and a woven stool in a travertine bathroom with a high window

How it works

How does a full bathroom remodel run, step by step?

A full bathroom remodel runs in a deliberate order: design and selections, permit applications where the city requires them, demolition, framing and rough-in, inspections, waterproofing and the shower pan, tile and stone, glass and fixtures, then paint and a final inspection. The sequence protects the work. Cure times run on the manufacturer's clock: membrane and mortar set when the product says. Frameless glass is fabricated to measure after the tile is set. Much of the disruption lands in the first half of the project, while demolition and rough-in are underway, and the second half is finish work that moves quickly but cannot be rushed. The working schedule is agreed before demolition starts and updated as conditions change.

Walk-in tub with its door open, a built-in seat, a grab bar and a handheld shower in a travertine-tiled alcove

Permits

Does a bathroom remodel need a permit in Scottsdale?

Sometimes. A cosmetic refresh with no structural or trade work generally needs no permit in Scottsdale; a same-spot fixture swap can go the Minimum Permit route, per the City of Scottsdale home improvement permit guidance (opens in a new tab). Construction, structural improvements, demolition, and adding or relocating mechanical, electrical or plumbing systems need a permit, and projects other than Minimum Permits begin with plan review. Permits file through the city's SPUR portal; the first inspection needs to happen within 180 days of issuance, and unpermitted work draws a fine equal to twice the fee. What a specific project needs is settled by the city after review, and permit needs are confirmed before demolition, not after it.

As a rule of thumb, moving water lines, wiring or walls brings a permit, while cosmetic finishes alone generally need none.

Showers

How do waterproofing, tile and shower glass come together?

The build order matters: the layer that keeps water out lives behind the tile, and tile and grout are the finish, not the waterproofing. That distinction decides how a shower holds up. A properly built shower combines a sloped pan, a continuous membrane, careful detailing at corners and the curb, and stone or porcelain tile set once the substrate is ready. Tile industry installation standards cover pans, membranes and movement joints. Curbless, also called zero-threshold, showers take more pan work and a longer cure, which adds time to the schedule as well as cost. Frameless glass is templated after the tile is finished, so it is the last piece to arrive. A shower built this way is also easier to live with and to keep clean.

Curbless shower with sage green vertical tile, a pebble floor, a bench and bronze fixtures next to a walnut vanity

Materials

How do design and material choices work in a bathroom remodel?

In a bathroom remodel, design leads and materials follow: layout and lighting first, then surfaces chosen for how they wear and clean. Porcelain and natural stone tile, frameless glass, quality fixtures and layered lighting are the choices that make a bathroom feel considered rather than merely new. Storage should match the room's real routine, from a medicine cabinet to a bank of drawers that opens all the way. A project stays calm with 2 practical rules. Selections get locked in the design phase, since cabinet and vanity orders can take several weeks. And nothing is ordered until field measurements are taken, so the pieces fit the room instead of the brochure. Questions about scope or selections? Call (602) 782-5702.

Material samples on a light surface: travertine, a walnut block, sage glazed tiles, white marble and a brass pull

Water and air

How is ventilation handled in a Scottsdale bathroom?

Every bathroom needs air moving through it, and a good fan is sized for the room and ducted to the outside, never into the attic. Ventilation is checked and often upgraded during a remodel, because the work opens the walls and ceiling where the duct run lives. In the desert the fan earns its keep: it clears shower moisture, keeps humidity off paint and mirrors, and removes odors. Beyond the model number, 2 details matter most. The duct has to reach the outside, and the fan has to be quiet enough that people actually turn it on. A fan with a timer or humidity sensing does the remembering for you. The moment to plan this is electrical rough-in, while the walls are still open and the switch location can be set properly.

Timeline

How long does a full bathroom remodel take?

A national cost guide puts the average full bathroom remodel at 2 to 4 weeks from start to finish, within a range of 2 to 12 weeks, and it runs longer when tile, glass or custom vanities are involved or when plumbing moves. A tub to shower conversion can take as little as 2 days with a prefabricated unit and 1 to 2 weeks or longer for a custom one. Some waits sit outside the construction window: cabinet and vanity orders, frameless glass made after the template, and special order tile. The schedule stays honest when ordering happens before demolition starts. The materials that stop water need their own cure time, so the middle of the job follows the product schedule. The work sequence is agreed up front, and updates follow as the project moves.

White drop-in tub set into a sage green tiled alcove under a window, with a brass shower fixture and a folded towel

Mistakes

What commonly goes wrong on bathroom remodeling projects?

Much bathroom trouble starts behind the surface, and water is a frequent source. The Insurance Institute for Business and Home Safety (opens in a new tab) describes interior water damage as one of the most consistent sources of insurance claims and losses. Bathrooms concentrate plumbing connections, because supply and drain lines pass through the walls behind tile and cabinetry. The failures are predictable in type: waterproofing done wrong or skipped, pans built flat, ventilation that never leaves the house, and supply lines behind the walls that have aged out. Cutting tile and stone also creates fine dust that the trades manage with the right tools and protections. A careful remodel treats every one of these as scope, with the details checked before finishes cover them.

White freestanding soaking tub with a floor-mounted filler in a travertine bathroom with a wooden stool and a window

5 questions

Questions people ask

Still have a question? Call (602) 782-5702 and describe the bathroom.

How long will the bathroom be out of service during a remodel?

A national cost guide puts the average full bathroom remodel at 2 to 4 weeks, and much of the disruption sits in the first half, while demolition and rough-in are underway. Some homeowners lean on a second bathroom or a temporary routine nearby. The working sequence is agreed before demolition starts, and updates follow as it moves.

Can the layout change, or the plumbing move?

Sometimes. Whether a wall can come out or a drain can move is decided by the city after review, and moving plumbing adds cost and time to the project. The layout is planned first, then matched against what the structure and the permit allow, before any demolition begins.

Which bathroom should be remodeled first?

Often the primary bathroom comes first, because it tends to see the most daily use. Guest baths, powder rooms and casita bathrooms can follow as a later phase. The order often comes down to which room has the most worn surfaces or the plumbing with the most age on it.

Do materials get chosen before work starts?

Yes. Selections drive the schedule: vanity and cabinet orders can take several weeks, special order tile and fixtures vary by line, and glass is made to measure after tile is set. Deciding tile, stone, fixtures and lighting in the design phase is what keeps demolition from starting before the project can finish.

What happens if hidden damage turns up once the walls are open?

It happens, especially in homes where a slow leak has had years to work behind a wall. When demolition turns up something unexpected, the repair becomes its own line in the scope, with its own cost and time. Hidden conditions are why scope is confirmed room by room instead of assumed.

Stone walk-in shower at dusk with a rain head, a lit wall niche, a bench and a walnut vanity in the foreground

Your bathroom project

Bathroom remodel on your mind in Scottsdale?

Pick the service you need, then leave your name, number and ZIP code (city optional). Someone will call you back to talk it through.

Thank you. You will be called back soon.

Or email contact@scottsdalebathroomrenovations.com

Prefer to call?Call (602) 782-5702
Talk about your bathroom project(602) 782-5702

Before you go: want a call back?

Leave your name, phone number, ZIP code and the service you need, and someone will call you back about your bathroom.

Thank you. You will be called back soon.

Or call (602) 782-5702